SpeedoHealer INSTALLATION
2007-2008 Honda CBR600RR
Note: Use this guide in conjunction with the instructions received with your SH-U01 harness kit.
1. You'll need an SH with Universal harness
kit for this bike.
2. Remove the seat, raise and support the fuel tank.
3. Disconnect the Speed Sensor connector. It is located on top of the gear box.


4. Cut the Pink/Green lead about 2 inches (5 cm) away from the connector, then strip off approx. 0.4" (1 cm) insulation from both wire ends.
5. Strip off approx. 0.4" (1 cm) insulation from the other two wires. Try to do this without cutting the conductor of these wires.
6. Splice the SH harness as follows (soldering is recommended):
| Wire color of SH harness | Wire color of Speed Sensor connector |
|
Red Black White Green |
Purple/Black Green/Black Pink/Green towards the connector Pink/Green towards the main harness |
7. Use the supplied shrinkable tubes, or electrical tape to insulate the solder joints.
8. Mount the SH box under the passenger's seat with the supplied Velcro strips.
9. Route the SH harness along the frame to the location of the box, then plug-in the 4p harness connector.
10. Test the SH functions as per the the supplied install instructions.
Michael N, USA